Pressemeldinger 2017

Paced For Growth: Nexans lanserer strategisk plan 2018-2022

13.12.17

Møter morgendagens utfordringer i dag: Nexans kunngjør sin strategiplan "Paced For Growth" 2018-2022.

Mer...

Appointment of Anne Lebel as censor

29.11.17

The Nexans Board of Directors decided to appoint Anne Lebel as censor with a view to proposing her candidature as member of the Board of Directors to the 2018 shareholders’ general meeting.

Mer...

Nexans Launches New Tray Cable Range For Dynamic Applications

Nexans has responded by carrying out a major research and development program to create the new INTERCOND® Tray Cable range that combines the virtues of a tray cable with the dynamic capabilities of an advanced automation cable suitable for servo motor installations.

Mer...

Nytt høyspent testlaboratorium ved Calais Center of Excellence

Paris La Défense, November 22, 2017 – Nexans has decided to significantly enhance its testing capacity by building in Calais, France, a new state-of-the-art direct current (DC) laboratory that allows to test simultaneously three independent qualification loops.

Mer...

Resultat tredje kvartal 2017

07.11.17

Paris, 7. november 2017 –  I dag la Nexans Gruppen frem resultatet for tredje kvartal 2017.

Mer...

Abu Dhabi's Nasr II oljefelt skal drives med kraft fra 3 000 km Nexans-kabler

Nexans ble valgt av EPC-entreprenøren Hyundai Heavy Industries (HHI) som eneste kabelleverandør for den andre og mest avgjørende pakken av prosjektet

Mer...

Nexans leverer sjøkabel som skal øke båndbredden i Malaysia

Nexans skal produsere og levere 250 kilometer med fiberoptisk sjøkabel til Huawei Marine. Selskapet skal være totalleverandør til byggingen og leggingen av SEAX-1-kabelsystemet.  

Mer...

Nexans' nye kabelleggingsfartøy gir verden mer ren energi

Nexans kan nå med stolthet kunngjøre at byggingen av et nytt kabelleggingsfartøy for undersjøiske HV-kabelsystemer har startet.

Mer...

Halvårsresultat 2017

27.07.17

Paris La Défense, 27. juli 2017 –  I dag offentliggjorde Nexans halvårsresultat 2017.

Mer...

Nexans skal levere 320 KV kabler til TenneTs offshore DC-link "Dolwin6"

To 90 kilometer lange høyspentkabler fra Nexans vil transportere opptil 900 MW vindkraft fra Nordsjø-klynge 3 til transformatorstasjonen Emden/Ost.

Mer...

Nexans befester sin posisjon som markedsleder innen undersjøiske systemer gjennom rammeavtale med BP

10.07.17

Nexans kunngjorde i dag at de har inngått en femårig global rammeavtale med BP. Den omfatter prosjektering, anskaffelser og bygging av umbilical-systemer [og DEH-systemer (Direct Electrical Heating)] samt tilleggsutstyr. Avtalen omfatter også levering av ettermarkedstjenester. Den nye avtalen utvider og styrker det langsiktige samarbeidet mellom BP og Nexans som begynte i 2002.

Mer...

Description of the share Buyback program authorized by shareholders at the annual shareholders meetings of May 11,2017

07.07.17

On July 7, 2017, the Board of Directors has decided to implement a share buyback program under the terms and conditions of Article 5 of European Regulation 2014/596 of April 16, 2014 on market abuse (MAR)

Mer...

Nippon High Voltage Cable Corporation er nå et heleid Nexans-selskap

Tokyo Bay-fabrikken øker Nexans gruppens produksjonskapasitet for å møte den økende etterspørselen etter kraft sjøkabler over hele verden.

Mer...

Nexans og Clem' bidrar til elektrisk mobilitet i regionen Champagne-Ardenne i Frankrike

149 ladestasjoner fra Nexans vil bli installert og administrert i samarbeid med det nye selskapet Clem’ i de 61 kommunene som utgjør Ardenne-Métropole.

Mer...

Nexans Launches Nexans Data Center Solutions to Help Hyperscale Data Center Operators Drive Tomorrow’s Hyper-Connected World

Headquartered in North America, the new global business unit launched by Nexans is designed to support global hyperscale data centers with physical-layer connectivity services and solutions in the hyper-connected world of tomorrow.

Mer...

Nexans’ kabler har blitt valgt for ny vindpark på Sortland

Ånstadblåheia vindpark skal levere fornybar kraft til om lag 7500 husstander når den står ferdig i 2018. Nylig fikk Nexans Norway tildelt kontrakten på kraftkablene som skal frakte den ”grønne” kraften til nettet.

Mer...

Mixed Shareholder Meeting of May 11, 2017

11.05.17

Paris, May 11, 2017 – Nexans Mixed Shareholders’, held on May 11, 2017 at the Palais des Congrès in Paris, approved all the 26 resolutions proposed to the shareholders by the Board of Directors.

Mer...

Nexans installerer Nord-Amerikas lengste undersjøiske kraftkabel!

Det er litt av en operasjon som pågår når kabelen som knytter øya Newfoundland sammen med Nova Scotia, installeres i disse dager. Et betydelig antall menn og kvinner fra Nexans og underleverandører er på plass for å bringe mer fornybar energi til regionen. 

Mer...

Resultat første kvartal 2017

03.05.17

Paris, 3. mai 2017 – I dag la Nexans Gruppen frem resultatet for første kvartal 2017.

Mer...

Prospectus related to bond issue

03.04.17

Paris, April 3rd, 2017 – The prospectus for admission to trading on the regulated market of Euronext Paris of a bond of € 200 million bearing interest at 2.75% per annum and maturing on April 5, 2024, was approved by the AMF under number 17-130.

Mer...

Successful placement of a bond issue in the amount of 200 milion euros, maturity April 5, 2024

29.03.17

Nexans successfully placed a € 200 million bond issue today. This fixed rated issue has a maturity of 7-years (April 5, 2024 term) and an annual coupon of 2.75 % p.a..

Mer...

Nexans feirer 40-årsjubileum for Skagerrak-forbindelsen

Med fire masseimpregnerte HVDC-kabler fra Nexans har kraftforbindelsen mellom Danmark og Norge en kapasitet på til sammen 1 700 megawatt, med åpning for mer fornybar energi.

Mer...

Nexans' 2016 Registration Document

20.03.17

The 2016 Registration document has been filed with the AMF (Autorité des Marchés Financiers) on March 20, 2017.

Mer...

Nexans bidrar til å øke brannsikkerheten på tog

Rail transportation plays an integral role in the global transportation industry with a steady growth in rail passenger transport observed between 2011 and 2015 and around 416 billion ton-kilometers traveling by train freight in Europe alone in 2015.

Mer...

Nexans og ffly4u kobler kundene til sine kabeltromler gjennom Internet of Things (IoT)

Nexans og ffly4u, spesialist i den industrielle Internet of Things (IOT), innfører en banebrytende sporings- og styrings tjeneste som ikke bare lar kundene får oversikt over den nøyaktige plasseringen av sine tromler, men også forteller dem hvor mye kabel som er igjen.

Mer...

Årsresultat 2016

09.02.17

Paris, 9. februar 2017 - Nexans presenterte årsresultat 2016 på en pressekonferanse i Paris.

Mer...